Proposed Refurbishment Of The Swimming Pool Changing Rooms at Droitwich Spa Leisure Centre
What the buyer wrote
The refurbishment of the wet side changing rooms at Droitwich Spa Leisure Centre, which involves, new changing & shower cubicles, lockers, benches vanity units, new openings, joinery, wall & floor finishes , ceiling grid, LED lighting including wiring, drainage alterations to shower areas and new domestic hot & cold feeds.
Details
- What the buyer calls it
- Proposed Refurbishment Of The Swimming Pool Changing Rooms at Droitwich Spa Leisure Centre
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Oct 2017
- Work ends
- 22 Dec 2017
Who the buyer named
The buyer published a contact address on this notice.
