Skip to the main content
The Crier

Proposed Residential Design and Build Project for Troutbeck Crescent

Your saved contracts

What the buyer wrote

It is anticipated that the project will include construction of 75 residential units comprising of a mix of one bed flats and two and three bed homes with associated external infrastructure and public landscaping. Design work, to RIBA Stage 3 is currently underway. Submission of the application to Local Authority Planning is anticipated in January 2019.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

RP Tyson Construction Limitedends (28 Feb 2021)

Details

What the buyer calls it
Proposed Residential Design and Build Project for Troutbeck Crescent
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
19 Aug 2019
Work ends
28 Feb 2021

Who the buyer named

The buyer published a contact address on this notice.

FTSprocurementnotices@blackpool.gov.uk