Provision for Lee Valley White Water Centre Bridge Repairs
What the buyer wrote
The Authority has a requirement for the repair and painting of 3 x bridges at The Lee Valley White Water Centre. The bridges are suffering from the normal effects of wear and tear and need some miscellaneous repairs. Some of the paintwork on and under all of the bridges looks jaded, and in certain areas is missing or flaking. This in turn has led to certain areas of bare metal interacting with the elements, such as wind / rain / splashes from the white-water course, and some rusting has started to occur.
Currently held by
Details
- What the buyer calls it
- Provision for Lee Valley White Water Centre Bridge Repairs
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 1 Aug 2025
- Work ends
- 10 Oct 2025
- Where
- in London
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
Genevieve D'Souza was the named contact on this notice. Questions closed on 3 Jun 2025, 13:00 BST.