Provision of Drawings and Engineering for the Modular Plant on the IMP@CT research project
What the buyer wrote
The Contracting Authority intends to build a modular, mobile, containerised mineral processing plant (throughput: 5TPH) that is rapidly deployable, even in difficult terrain, without substantial infrastructure development costs.The following items shall be in the scope of obligations of the Contractor: 1) All shop & as-built (record) drawings for all sections of the Plant (including: comminution & classification, ore-sorting, jigging, spiralling & tabling, and flotation). The Contractor shall prepare and submit to the Contracting Authority such drawings and documents as being specified in the Annex 3. 2) The engineering, construction and cold-commissioning (off-site test) phases of the ji…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Provision of Drawings and Engineering for the Modular Plant on the IMP@CT research project
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 May 2018
- Work ends
- 10 Jun 2019
- Kind of work
- Construction
Who the buyer named
The buyer published a contact address on this notice.