Provision of Highgate Railway Bridge Bearing Replacement and Concrete Repair
What the buyer wrote
Barnsley Metropolitan Borough Council (the Council) is looking to establish a Contract for Engineering and Construction work with a Provider for undertaking proactive maintenance on the Highgate Railway Bridge. The works required are to; - Repair the existing concrete bridge structure which will remain - Removal and replacement of the bearings of the bridge - Removal and replacement of the bridge deck expansion joints - Provision of suitable temporary support system along with temporary scaffolding to support the works. All tender documentation available to download via YORtender / Proactis (see link in Additional Details).
Details
- What the buyer calls it
- Provision of Highgate Railway Bridge Bearing Replacement and Concrete Repair
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 20 Jan 2020
- Work ends
- 20 Apr 2020
Who the buyer named
The buyer published a contact address on this notice.
