Provision of Passenger Lift within London Wing at Croydon Hospital - CHS17-058
What the buyer wrote
The project involves the construction of a new lift shaft (including foundations) and connections to existing hospital street and the detailed design and installation of new fire escape passenger/bed lift to serve ground to third floors within the vicinity of existing Lift nr 1 which is situated within the London Wing of the Hospital. Drawings are provided within this PQQ which identify the proposed list location and other basic information. The lift can be noted as being within an existing courtyard area. There will be significant access and egress parameters together with the challenge of working within a live Hospital environment
Details
- What the buyer calls it
- Provision of Passenger Lift within London Wing at Croydon Hospital - CHS17-058
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 4 Jan 2018
- Work ends
- 19 Oct 2018
- Kind of work
- New build construction
Who the buyer named
Diana Arthur was the named contact on this notice.
