Provision of Support on Probabilistic Safety Assessment (PSA) for the Generic Design Assessment (GDA) of the UK AP1000
What the buyer wrote
1 BACKGROUND TO THE PROJECT 1.1 In December of 2011 ONR formally completed Step 4 of the Generic Design Assessment (GDA) of Westinghouse Electric Company’s (WEC) UK AP1000 reactor design. WEC is the Requesting Party for the UK AP1000 GDA (referred to as “the RP” in this specification). 1.2 Step 4 of the GDA was an in‐depth ONR assessment of the safety case evidence for a generic site envelope undertaken in accordance with the regulatory regime of Great Britain. The general intention of Step 4 was to move from the safety arguments and system level assessment of Step 3 to a fully detailed examination of the available evidence, on a sampling basis. The aim of Step 4 was to identify any fun…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Provision of Support on Probabilistic Safety Assessment (PSA) for the Generic Design Assessment (GDA) of the UK AP1000
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 28 Jun 2015
- Work ends
- 30 Nov 2016