What the buyer wrote
Details Provision of the 2 boats described below on an 8 month, end-user crewed, long term hire contract with a start date of the 1st February 2019. The vessels will be stored afloat on the end-users pontoons in the Milford Haven Waterways and will be used daily for transfer of personnel, tools and equipment - estimate a daily usage of 4Hrs (minimum) for each craft. 1."Work Boat- Up to 33ft LOA for sea keeping, vessel cannot be bigger than this due to docking requirements on the test platform. Minimum number of spaces for 10 people including crew. The vessel MUST be MCA coded CAT 2 for operation up to 60 miles from Safe Haven. Twin engine, Enclosed Bridge/cabin with seating for at leas…
Details
- What the buyer calls it
- Provision of work and support boats
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Feb 2019
- Work ends
- 30 Sep 2019
- Kind of work
- Transport and fleet, Civil engineering and groundworks
Who the buyer named
Mark Sullivan was the named contact on this notice.
