Skip to the main content
The Crier

PSF2 Lot 2 - Principal Bridge Inspections 2018-19

Your saved contracts

What the buyer wrote

Cumbria CC has identified 59 bridge sites and a further 4 highway maintained footbridge sites on the highway network around the County where Principal Bridge Inspections are required. There are 21 number bridges in the Carlisle Area, 13 number bridges in the Eden Area, 12 number bridges in the Allerdale Area, 5 number bridges in the Copeland Area and 12 number bridges in the South Lakes Area. A full Principal Bridge Inspection in accordance with BD 63/07 and the Management of Highway Structures (Code of Practice) is required for each bridge. For clarity, the County Council's interpretation of BD 63/07, in relation to Principal Bridge Inspections, is that access is required at all bridges to …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Capita Property & Infrastructure Ltd£172.6kends (31 Aug 2018)

Details

What the buyer calls it
PSF2 Lot 2 - Principal Bridge Inspections 2018-19
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Apr 2018
Work ends
31 Aug 2018

Who the buyer named

Alan Young was the named contact on this notice.

alan.young@cumbria.gov.uk