Skip to the main content
The Crier

PSF2 - Lot 2 - Principal Culvert Inspections 2017/18

Your saved contracts

What the buyer wrote

Cumbria CC has identified 25 culver sties on the highway network around the county where principal bridge inspections are required. There is 1 number culvert in the Allerdale Area, 1 number culvert in the Copeland area, 2 number culverts in the Carlisle area, 11 number culverts in the South Lakes Area and 10 number culverts in the Eden Area. A full principal bridge inspection in accordance with BD 63/07 and the management of highway structures (code of practice) is required for each culvert. For clarity, the County Council's interpretation of BD 63/07 in relation to principle bridge inspections, is that access is required at all culverts to allow an engineer to get within touching distance o…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Capita Plc£41.7kends (31 Aug 2017)

Details

What the buyer calls it
PSF2 - Lot 2 - Principal Culvert Inspections 2017/18
How they are buying
The buyer did not say
Type
services
Work starts
16 Apr 2017
Work ends
31 Aug 2017

Who the buyer named

John Ferguson was the named contact on this notice.

john.ferguson@cumbria.gov.uk