What the buyer wrote
The purpose of the project is to build a fully operational prototype self-powered, 50 kg/h (continuous process) waste biomass heater system. The equipment must be designed and built to operate safely when processing corrosive and abrasive biomass materials, at temperatures up to 600 DegC. Additional information: Breakdown of work to be tendered for: 1. Engineering design and analysis, before designing and building the system. 2. Mass and energy balance. 3. Design modification and optimisation. 4. HAZOP 5. Prototype fabrication. 6. Instrumentation and control system. 7. CE Marking. 8. On-site installation 9. Commissioning
Details
- What the buyer calls it
- Pyrolysis Auger Reactor Prototype Fabrication
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 8 Nov 2018
- Work ends
- 8 May 2019
Who the buyer named
Simon Ighofose was the named contact on this notice.