QU114 - Lifford Lane Waste Depot New Ablutions Block - Supply and Installation of Mesh Style Lockers
What the buyer wrote
Birmingham City Council requires a supplier for 227 supply of mesh style lockers for the male and female drying rooms in the new ablutions block at Lifford Lane Waste Depot. The installation of the lockers must be completed no later than the 13th July 2018. Mesh Locker Specification To supply, install and fix mesh style lockers to floor as detailed below: - To measure approx. width 305 depth 305 height 1980 - 150mm height legs with floor fixing brackets - To have fitted brackets to allow nesting side by side and back to back - Doors fitted with hasp and staple fitting for use with padlock (padlock to be provided by client…
Details
- What the buyer calls it
- QU114 - Lifford Lane Waste Depot New Ablutions Block - Supply and Installation of Mesh Style Lockers
- How they are buying
- The buyer did not say
- Type
- services
- Work starts
- 1 Jul 2018
- Work ends
- 13 Jul 2018
- Kind of work
- Construction, SEN and inclusion services
Who the buyer named
Manjit Samrai was the named contact on this notice.
