Skip to the main content
The Crier

Rapid Engineering Model v2

Your saved contracts

What the buyer wrote

The key aims of the Rapid Engineering Modelling Ver 2 ( to SGAR3/5) is to deliver greater and more efficient project level designs through: - Highways England taking greater control of standardised modular design development - Combined Driven/Drone based Surveying to create an accurate Digital Terrain Map Based asset platform - Rules Based Approach to Design Development derived from the principles demonstrated through the Ops Concept works - Reduction in the level of bespoke design resulting in increased costs due to varied design solutions in construction - Increased safety through greater level of consistency of working practises, methods and procedures.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Bryden Wood£1.2mends (30 Apr 2019)

Details

What the buyer calls it
Rapid Engineering Model v2
How they are buying
Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Jul 2018
Work ends
30 Apr 2019

Who the buyer named

The buyer published a contact address on this notice.

Rebecca.Jones2@highwaysengland.co.uk