The contract scope includes working with the design team to develop the design and cost model in a pre-construction period. During this period the Contractor will be required to procure temporary accommodation to create a temporary fire station on the site, assist in the decant of the fire station and subsequently demolish the existing property. On completion of the demolition construction of the new fire station will take place. After the construction period is completed the Contractor will assist in the decant from the temporary fire station and will remove the temporary buildings. This contract was awarded using using the Constructing West Midlands Framework Agreement; Lot 7

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Willmott Dixon Construction Limited£6.5mends (31 Dec 2017)

Details

What the buyer calls it
Reconstruction of Coventry Fire Station
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
21 May 2016
Work ends
31 Dec 2017