Skip to the main content
The Crier

Refactory Ceramic Fibre Issues

Your saved contracts

What the buyer wrote

To remove the existing RCF (refactory ceramic fibre) insulation material currently covering the supporting steel framework that forms the mezzanine floors within a 1st floor plantroom at NIBSC. To dispose of the removed refractory fibre insulation material and any contaminated items used in its removal from the NIBSC site in a safe and environmentally responsible manner. To apply a suitable encapsulated intumescent film product to a thickness that will ensure a minimum of 60 minutes fire protection of the steel framework that forms the mezzanine floors within the 1st floor plantroom of the BSD building. For further details please go to www.phe.bravosolution.co.uk

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Malrod£30kends (30 Sep 2016)

Details

What the buyer calls it
Refactory Ceramic Fibre Issues
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
3 Apr 2016
Work ends
30 Sep 2016

Who the buyer named

Rene Kiliaan was the named contact on this notice.

rene.kiliaan@nibsc.org