Skip to the main content
The Crier

Refresh of Local Transport Note 2/08 Cycle Infrastructure Design (DfT)

Your saved contracts

What the buyer wrote

1-495 Scope - Refresh of LTN2-08 CID The main objective of the refresh is to: ensure that the guidance reflects legal changes made since its inception (notably the aspects of the Traffic Signs Regulations and General Directions 2016 that impact on cycling); that current good practice is incorporated; and that aspects of the guidance that is outdated is removed. However, where appropriate, the contractor should consider where existing text can be improved or modified if it would improve usability

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

WSP£64.3kends (30 Sep 2018)

Details

What the buyer calls it
Refresh of Local Transport Note 2/08 Cycle Infrastructure Design (DfT)
How they are buying
The buyer did not say
Type
services
Work starts
26 Feb 2018
Work ends
30 Sep 2018

Who the buyer named

The buyer published a contact address on this notice.

Dafydd.Church@highwaysengland.co.uk