Skip to the main content
The Crier

Refurbishment of Harlow Playhouse Theatre Rigging Systems

Your saved contracts

What the buyer wrote

Tenders are invited for the Refurbishment, Upgrade, Testing and Commissioning of the Playhouse Theatre Main Auditorium Flying and Rigging Infrastructures. The Specification will link to 5 key areas; - Counterweight Flying System - Advance Bar - FOH Speaker Truss - Proscenium Arch Border - Single Purchase Bar 4 The existing flying system consists of 32 Double Purchase Fly Bars each bar is 11.5m in length and is picked up via 4 points evenly spaced along the length of the bar. Each point is picked up using 6mm SWR. The Current SWL is 250kgs uniformly distributed. The control line is 20mm Chatham Hemp. The cradles have a maximum capacity of 33x 15kg weights per cradle. Each Fly bar is lab…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Refurbishment of Harlow Playhouse Theatre Rigging Systems
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
10 Apr 2016
Work ends
1 Jul 2016

Who the buyer named

David Watts was the named contact on this notice.

david.watts@harlow.gov.uk