Refurbishment of Middle Chine Bridge and Alum Chine Footbridge

Your saved contracts

What the buyer wrote

The works to Middle Chine Bridge are as follows: • To prepare areas of corroded steel and paint the whole of the bridge. • Remove the hand rail and prepare and paint the localised areas of the parapet. • Repair / replace areas of heavily corroded steel sections and bolts as instructed. The works to Alum Chine Bridge are as follows: • Lift the timber decking and mesh panels and remove to store • To prepare areas of corroded steel and paint the whole bridge • Paint mesh panels • Replace the decking and mesh panels

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Coating Services£145.5kends (14 Oct 2016)

Details

What the buyer calls it
Refurbishment of Middle Chine Bridge and Alum Chine Footbridge
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
21 Aug 2016
Work ends
14 Oct 2016

Who the buyer named

Strategic Procurement Team was the named contact on this notice.