Refurbishment of Middle Chine Bridge and Alum Chine Footbridge
What the buyer wrote
The works to Middle Chine Bridge are as follows: • To prepare areas of corroded steel and paint the whole of the bridge. • Remove the hand rail and prepare and paint the localised areas of the parapet. • Repair / replace areas of heavily corroded steel sections and bolts as instructed. The works to Alum Chine Bridge are as follows: • Lift the timber decking and mesh panels and remove to store • To prepare areas of corroded steel and paint the whole bridge • Paint mesh panels • Replace the decking and mesh panels
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Refurbishment of Middle Chine Bridge and Alum Chine Footbridge
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 21 Aug 2016
- Work ends
- 14 Oct 2016
Who the buyer named
Strategic Procurement Team was the named contact on this notice.