Skip to the main content
The Crier

Refurbishment of Office Space to Clinical Accommodation ref. MKUH ITT 156

Your saved contracts

What the buyer wrote

The works comprise the formation of new outpatient accommodation to provide an Obstetric and Gynaecological Consulting Suite by reconfiguring vacated office area on the ground floor (level 1) of the main hospital. The existing layout was formed 1991 as part of the Phase 2 development (Wards 15 to 20). MKUH has separately procured enabling works (see enabling drawings in Appendix H-J) with the appointed contractor taking possession of the stripped out rooms in order to provide the following accommodation: a. 8nr consultation rooms (15m2) b. 3nr scanning rooms (15m2) c. 1nr clean utility/ drugs store d. 1nr dirty utility e. 1nr accessible female WC f. 1nr office g. 1nr of…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Refurbishment of Office Space to Clinical Accommodation ref. MKUH ITT 156
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
8 Jan 2020
Work ends
28 Feb 2020

Who the buyer named

James GATAWA was the named contact on this notice.

james.gatawa@mkuh.nhs.uk