Remediation of contamination at Natural England's Bolton Fen site
What the buyer wrote
The Authority Natural England (NE) require a contractor to cover CDM on making the Bolton Fell Moss former factory site safe for visits by the public. Budget covered by LIFE13 NAT/UK/000443 project. NE are seeking a supplier to clear a site of both suspected non-hazardous and hazardous waste. The Works comprise of the following:- - Removal of Non-Hazardous wastes from Site; - Removal of Hazardous Wastes from Site; - Reducing existing Walls/Footings/Kerbs from previous buildings to surrounding slab levels; - Demolition and Removal of Portacabin; - Infilling of two Lagoons and removal of associated barriers; and - Locating, emptying, sealing and capping of two potential septic tanks…
Details
- What the buyer calls it
- Remediation of contamination at Natural England's Bolton Fen site
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Jul 2019
- Work ends
- 2 Aug 2019
Who the buyer named
The buyer published a contact address on this notice.
