Renewal of Single Pipe Heating System at the Forest Academy
What the buyer wrote
The works generally include for the removal of the existing single pipe heating system pipework with all old column style radiators whilst retaining the newer panel radiators and re-piping in a standard twin pipe flow and return distribution system. The works shall include the removal of redundant services including existing radiators and interconnecting LTHW pipework, valves and fittings and with an option of replacing the existing circulation pumps. The Boilers and boiler house systems and all gas, hot and cold water distribution pipework, plant and equipment, taps, valves and fittings etc. throughout the existing buildings are to remain as built. The works shall comprise the supply, in…
Details
- What the buyer calls it
- Renewal of Single Pipe Heating System at the Forest Academy
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 14 Jul 2019
- Work ends
- 30 Aug 2019