Replacement of AN95 Panels at Royal Preston Hospital
What the buyer wrote
The remaining Protec AN95 panels are to decommissioned, disconnected and removed. New fire alarm panels of equal capacity are to be installed and connected onto the existing fire alarm loop wiring. The new panels would run the existing fire alarm devices. To achieve a seamless integration onto the site fire alarm network the new panels would be connected to the network isolation connection points sited locally to the panels All the information from the new panels would be displayed on the site monitoring fire alarm panel sited in the Main Switchboard onsite at Royal Preston Hospital.
Details
- What the buyer calls it
- Replacement of AN95 Panels at Royal Preston Hospital
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 1 Dec 2017
- Work ends
- 31 Mar 2018
- Kind of work
- Electrical installation
Who the buyer named
The buyer published a contact address on this notice.
