Replacement of AN95 Panels at Royal Preston Hospital

Your saved contracts

What the buyer wrote

The remaining Protec AN95 panels are to decommissioned, disconnected and removed. New fire alarm panels of equal capacity are to be installed and connected onto the existing fire alarm loop wiring. The new panels would run the existing fire alarm devices. To achieve a seamless integration onto the site fire alarm network the new panels would be connected to the network isolation connection points sited locally to the panels All the information from the new panels would be displayed on the site monitoring fire alarm panel sited in the Main Switchboard onsite at Royal Preston Hospital.

Details

What the buyer calls it
Replacement of AN95 Panels at Royal Preston Hospital
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
1 Dec 2017
Work ends
31 Mar 2018