Skip to the main content
The Crier

Replacement of cladding at Adair Tower and Hazelwood Tower - Design

Your saved contracts

What the buyer wrote

The Royal Borough of Kensington and Chelsea is currently removing external cladding from Adair Tower and Hazelwood Tower, two 14 storey tower blocks located in the north of the Borough. It is intended to replace the cladding on both buildings with an A1 certified fire rated cladding system while at the same time replacing aluminium windows and balcony doors. The Council is looking to engage an architect that has the direct experience and immediate capacity to undertake the design of the cladding, windows and balcony doors to both towers through to and including RIBA Stage 4. A structural surveyor has been separately engaged to consider the load that replacement cladding may put on…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Replacement of cladding at Adair Tower and Hazelwood Tower - Design
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
14 Apr 2019
Work ends
31 Oct 2019

Who the buyer named

Westminster City Council was the named contact on this notice.

tenders@westminster.gov.uk