Replacement of cladding at Adair Tower and Hazelwood Tower - Design
What the buyer wrote
The Royal Borough of Kensington and Chelsea is currently removing external cladding from Adair Tower and Hazelwood Tower, two 14 storey tower blocks located in the north of the Borough. It is intended to replace the cladding on both buildings with an A1 certified fire rated cladding system while at the same time replacing aluminium windows and balcony doors. The Council is looking to engage an architect that has the direct experience and immediate capacity to undertake the design of the cladding, windows and balcony doors to both towers through to and including RIBA Stage 4. A structural surveyor has been separately engaged to consider the load that replacement cladding may put on…
Details
- What the buyer calls it
- Replacement of cladding at Adair Tower and Hazelwood Tower - Design
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 14 Apr 2019
- Work ends
- 31 Oct 2019
Who the buyer named
Westminster City Council was the named contact on this notice.
