Skip to the main content
The Crier

Replacement of Sewage Pumps and Fould Drainage on HMS Belfast

Your saved contracts

What the buyer wrote

Foul waste currently is pumped from the ship via two macerator pumps - one located forward, the other aft. The sewage pipes are flexible rubber, and run down the side of the ship, across the river bed an up through the river wall to connect into a drain in front of the 'Pavilion' building which accommodates the visitor entrance. The Contract comprises: 1. Replacement of the two macerator sewage pumps on the HMS Belfast. 2. Supply and install a new permanent connection to land of insulated, trace heated, stainless steel foul rising main from the pumps, along the ship and across the 'Brow' walkway 3. Connection of same into the foul drain on shore to a manhole adjacent to the South si…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Replacement of Sewage Pumps and Fould Drainage on HMS Belfast
How they are buying
The buyer did not say
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 May 2017
Work ends
28 Sep 2017

Who the buyer named

Chris Cast was the named contact on this notice.

ccast@iwm.org.uk