Replacement of Sewage Pumps and Fould Drainage on HMS Belfast
What the buyer wrote
Foul waste currently is pumped from the ship via two macerator pumps - one located forward, the other aft. The sewage pipes are flexible rubber, and run down the side of the ship, across the river bed an up through the river wall to connect into a drain in front of the 'Pavilion' building which accommodates the visitor entrance. The Contract comprises: 1. Replacement of the two macerator sewage pumps on the HMS Belfast. 2. Supply and install a new permanent connection to land of insulated, trace heated, stainless steel foul rising main from the pumps, along the ship and across the 'Brow' walkway 3. Connection of same into the foul drain on shore to a manhole adjacent to the South si…
Details
- What the buyer calls it
- Replacement of Sewage Pumps and Fould Drainage on HMS Belfast
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 May 2017
- Work ends
- 28 Sep 2017
- Kind of work
- Water, drainage and flood management
Who the buyer named
Chris Cast was the named contact on this notice.
