Replacement of the D12 and F2 Switchgear at Culham Science Centre

Your saved contracts

What the buyer wrote

The scope includes but shall not be limited to: Replace the 60 years old English Electric LV ACBs in the switch panels with a retrofit withdrawable solution with equivalent Form 4 Type 7 ACBs in the two separate switchrooms in D12 and in the single switchroom in F2; The new ACBs must match the ratings from the obsolete ACBs and must provide like-for-like protection with adjustable settings; The retrofit solutions shall meet modern day safety standards; Introduction of intelligent monitoring of electrical loads; power demand and quality with real-time meter readings via networked PCs; and The retrofit solution must have a minimum lifetime of 25 years.

Details

What the buyer calls it
Replacement of the D12 and F2 Switchgear at Culham Science Centre
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
11 Jan 2021
Work ends
31 May 2021

Who the buyer named

Andy Kynaston was the named contact on this notice.