Replacement of the Heating, Ventilation and Cooling system at the Vivacity Premier Fitness Changing facilities.
What the buyer wrote
PL advised PCC that the existing air handling equipment serving the male and female changing rooms is defective and requires replacing. The need for replacement had been highlighted by an increased level of condensation occurring within the changing rooms and to the surface finishes, which has in turn led to mould growth occurring to the suspended ceilings. As a result of the increased condensation levels, PL had to close the centre for a short period of time to enable repairs to be undertaken and the mould removed from the surface finishes within the changing rooms. Following the investigations it was identified The inspections and testing of the existing, originally installed, air handl…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Replacement of the Heating, Ventilation and Cooling system at the Vivacity Premier Fitness Changing facilities.
- How they are buying
- The buyer did not say
- Work starts
- 31 Jul 2025
- Work ends
- 31 Mar 2026
- Where
- in the East of England
Who the buyer named
Mrs Sarah Holmes was the named contact on this notice.