Replacement of the hydraulic system including replacement of existing control panel Project Start
East Lindsey District CouncilEast Midlands
What the buyer wrote
Meridian Leisure Centre, Louth - During the course of recent inspection maintenance visits, the existing hydraulic movable pool floor to the main 25m pool has developed a major defect requiring urgent replacement of the hydraulic system including assistance using an underwater diving support team. The existing movable floor control panel system also requires replacement due to the current system being closed protocol and locked to the original installer.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Replacement of the hydraulic system including replacement of existing control panel Project Start
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Where
- in the East Midlands
Who the buyer named
Mark Starkey was the named contact on this notice.
