Skip to the main content
The Crier

Replacement of the hydraulic system including replacement of existing control panel Project Start

Your saved contracts

What the buyer wrote

Meridian Leisure Centre, Louth - During the course of recent inspection maintenance visits, the existing hydraulic movable pool floor to the main 25m pool has developed a major defect requiring urgent replacement of the hydraulic system including assistance using an underwater diving support team. The existing movable floor control panel system also requires replacement due to the current system being closed protocol and locked to the original installer.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
Replacement of the hydraulic system including replacement of existing control panel Project Start
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Where
in the East Midlands

Who the buyer named

Mark Starkey was the named contact on this notice.

mark.starkey@cpbs.com