What the buyer wrote

The existing Blue Box chiller has failed and a Tetris 32.4 chiller has temporarily been hired to provide chilled water to the roof mounted Ahu's and controlled via the sites own pumps and BMS system. The hired chiller has a nominal capacity of 300kw. The failed chiller has been temporarily located externally in the loading bay area and was a Tetris 38.4 STIPLN with a nominal 350 / 360kw. It is roof mounted and sited upon big foot support systems.

Details

What the buyer calls it
Replacement Water Chiller at Buckland Hospital Dover
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
16 Sep 2018
Work ends
28 Sep 2018

Who the buyer named

Robert Lewins was the named contact on this notice.

robert.lewins@nhs.net