Rescue Pump Fire Engineering Electrical Upgrade
What the buyer wrote
BFRA has three Scania appliances fitted with a failed fire engineering system together with associated wiring looms. These appliances were manufactured in 2009 and now require an electrical upgrade to a CANbus controlled system. The schedule of work is to be completed in stages following acceptance testing of each appliance, firstly Fleet 77, followed by Fleet 78 and Fleet 79.
Details
- What the buyer calls it
- Rescue Pump Fire Engineering Electrical Upgrade
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 25 Jun 2017
- Work ends
- 8 Dec 2017
Who the buyer named
Procurement Team was the named contact on this notice.
