Reserved Procurement - Active Filter Change Robot Mechanical Modifications

Your saved contracts

What the buyer wrote

This package of work includes 3 aspects, which require varying degrees of design work, in addition, the contractor is to manufacture all specified items to the agreed designs and standards. An ‘Integration review’ is to be held once the robot is manufactured and the two design packages are at detailed design. Robot: Manufacture all items detailed in the detail design drawings to the specified tolerances and in accordance with the specified standards. Some components are to be modified from existing components, supplied by NRS. Alpha panel: The alpha panel design to be progressed from approved scheme to detail design and manufactured. Shield wall: The shield wall design to be progressed from …

Read all of it on Find a Tender →

Details

What the buyer calls it
Reserved Procurement - Active Filter Change Robot Mechanical Modifications
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Where
in Scotland
Kind of work
Construction

Who the buyer named

Hannah Budge was the named contact on this notice. Questions closed on 21 Mar 2025, 12:00 GMT.