(Retender) Framework for the Provision, Installation, Operation and Maintenance of Electric Vehicle Charging Units for the Taxi Industry

Your saved contracts

What the buyer wrote

The framework is for the design, construction/installation and subsequent operation (including maintenance and back office support) of EV charging units primarily for the taxi trade. NECA have secured monies from The Office for Low Emission Vehicles Taxi Infrastructure fund which will be used to fund the upfront 75% of the capital costs of each EV Charging Unit associated with the design and build element of the Call-Off Contract (including the Actual Connection Fee charged by the relevant utility supplier to connect the EV Charging Unit to the power grid). The Contractor will fund 25% of the capital costs of each EV Charging Unit plus the ongoing operation and maintenance of each of the …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Swarco UK Ltd£500kends (7 Feb 2024)

Details

What the buyer calls it
(Retender) Framework for the Provision, Installation, Operation and Maintenance of Electric Vehicle Charging Units for the Taxi Industry
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
7 Feb 2020
Work ends
7 Feb 2024

Who the buyer named

Graham Dunn was the named contact on this notice.