Skip to the main content
The Crier

RFQ 2025/40 - Distribution Board Replacement and Lift Supply Installation - Greenbank Garage

Your saved contracts

What the buyer wrote

Two new vehicle lifts have been installed in Greenbank Garage Newry, Mourne and Down District Council, however these cannot currently be connected due to insufficient supply capacity. Each lift requires a 32A 400V 3-phase supply, whereas the existing installation provides only a single 16A 400V outlet that previously servicing the old lift. The existing distribution boards within the Garage contain spare ways, but the circuit breakers required to support new or modified circuits are now obsolete. As such, replacement of the existing distribution boards and associated switchgear is required to facilitate the new lift supplies and to ensure compliance with current electrical standards. The tw…

Read all of it on Find a Tender →

Details

What the buyer calls it
RFQ 2025/40 - Distribution Board Replacement and Lift Supply Installation - Greenbank Garage
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services

Who the buyer named

Adrian Doyle was the named contact on this notice. Questions closed on 8 Dec 2025, 17:00 GMT.

adrian.doyle@nmandd.org