RFQ - Deadweight Machine Control System Upgrades
What the buyer wrote
NPL is looking to upgrade the control componentry for three deadweight force standard machines (2.5 kN, 20 kN, 120 kN capacities). The systems are being refurbished to interface with new LabVIEW control software (written in-house by NPL staff) and to enhance long-term maintainability. As part of this process, all control items are being assessed for their current performance and state of obsolescence. NPL is seeking competitive quotes for the supply of hardware and a hardware system design document for each machine independently. There is no interfacing between machines. The sequence of upgrades will be the 2.5 kN first, followed by the 120 kN machine, and finally the 20 kN. The hardware …
Details
- What the buyer calls it
- RFQ - Deadweight Machine Control System Upgrades
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 May 2019
- Work ends
- 1 Apr 2020
Who the buyer named
The buyer published a contact address on this notice.
