What the buyer wrote
Hollicombe Head is a sandstone cliff located in Paignton between Hollicombe and Marine Parade. In the mid 1800’s to the rear of the cliff the main railway line between Paignton and London was constructed. Over the years due to the cliff being exposed to the full force of easterly storm events, coastal erosion has been occurring. The rate of coastal erosion has varied along the length of the cliffs and due to the risk of the railway being lost in the 1950’s rock armouring was installed as coastal protection to a large section of the cliffs behind Hollicombe beach. A section of the cliffs did not receive rock armouring at this time and it is this section of cliffs that is now eroding significa…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Rock Armour Protection Works to Hollicombe Cliff
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 17 Oct 2016
- Work ends
- 10 Apr 2017
Who the buyer named
Miss Tracey Field was the named contact on this notice.
