ROW Charlton Mackrell Footbridge Improvements (2224)
What the buyer wrote
Remove and disposal of current 7.35m span steel framed, timber clad footbridge and concrete foundations over the River Cary near Charlton Mackrell. Construction of standard SCC designed concrete foundations. Supply and install standard SCC designed steel framed/timber clad footbridge (approximately 11-12m in length). Installation of any steps, gates, fencing and landscaping required. Tenders to be supplied via Supplying the Southwest portal.
Details
- What the buyer calls it
- ROW Charlton Mackrell Footbridge Improvements (2224)
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 19 Aug 2019
- Work ends
- 19 Aug 2020
Who the buyer named
Ms Tracie Bosher was the named contact on this notice.
