What the buyer wrote
Carriageway planing and resurfacing. Plane off 110mm of existing bituminous surfacing and reinstate using the following method: Provide and lay 60mm of 20mm DAC HDM binder course Provide and lay 50mm of 55/14 WTR2 high stone content asphalt surface course Remove 340m of channel kerbs and replace with surfacing material. New thermoplastic road markings shall be applied throughout the extents of the scheme. Ironworks shall be adjusted (if necessary) to suit carriageway levels or as directed by the engineer Due to the location of the scheme the work shall be carried out during the evenings. A full road closure will be in place for the duration if the works.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Sandside, Scarborough - Surfacing
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Oct 2017
- Work ends
- 22 Oct 2017
- Kind of work
- Construction, Highways, street works and traffic
Who the buyer named
Alison Dickinson was the named contact on this notice.
