What the buyer wrote
1. Production of a prioritised survey schedule 2. Production of survey specifications in accordance with the schedule produced in stage 1 The first stage has resulted in a report (70045694-30-REP-0008) that gave a recommended priority for surveys. This proposal is based on the surveys proposed in that report. The specifications produced will define - The scope of the survey - The level of the survey: visual, measurement etc (recognising that intrusive surveys may not be appropriate at this point in the project within operational buildings) - Information that already exists - The format of the output from the surveys (to ensure that information is presented consistently) - The c…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- SCAH Survey Work
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 28 Oct 2019
- Work ends
- 31 Dec 2019
- Kind of work
- Construction
Who the buyer named
The buyer published a contact address on this notice.
