SCC - Remedial Works to the Existing Concrete Prince George Extension on Southend-on-Sea Pier
What the buyer wrote
Southend-on-Sea City Council are seeking a suitably qualified and experienced contractor to carry out structural repairs and the installation of a suitable method of corrosion protection to extend the life of both the existing, undamaged, and repaired sections of the Prince George extension at the sea end of the Pier. The works will consist of breaking out all loose and damaged concrete to expose corroded reinforcement, the replacement of the corroded reinforcement and the repair of the concrete. The concrete repair will incorporate the installation of a titanium mesh which will be connected to a small electric current to provide protection against future corrosion. The whole of the existing…
Details
- What the buyer calls it
- SCC - Remedial Works to the Existing Concrete Prince George Extension on Southend-on-Sea Pier
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Where
- in the East of England
Who the buyer named
Mrs Norma Ashton was the named contact on this notice.
