Science and Industry Museum, Manchester - Power Hall Temporary Roof

Your saved contracts

What the buyer wrote

There is an urgent requirement for a temporary over roof enclosure and internal crash deck. The building continues to deteriorate rapidly. The protection against the weather is required to ensure the longevity and continued functionality of the heritage asset; to halt degradation. The enclosing 'wrap' must be weathertight and prevent water ingress. The design must provide for future adaptability for adaptation by a main contractor for repairs to the fabric, e.g. provision for compounds, site accommodation, walkways, to adjust the height and profile of the temporary roof to provide sufficient access and working space. In addititon to this an internal crash deck is to be installed as part o…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

3 D Scaffolding Ltd£912.1kends (14 May 2021)

Details

What the buyer calls it
Science and Industry Museum, Manchester - Power Hall Temporary Roof
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
14 May 2019
Work ends
14 May 2021