Scotswood Community Hub New Build-Commissioning of Engineers (up to RIBA Plan Of Works Stage 3)
Your Homes Newcastle Ltdservices
What the buyer wrote
Appointment of Engineers to work alongside IDPartnership in developing the masterplan and developing the designs and layout for the neighbourhood centre up to RIBA Plan Of Works Stage 3. To carry out design and engineering work for a new 45 bed assisted living scheme as part of the Scotswood Community Hub / Neighbourhood Centre, located within The Rise.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Scotswood Community Hub New Build-Commissioning of Engineers (up to RIBA Plan Of Works Stage 3)
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Jan 2018
- Work ends
- 31 Mar 2018
- Kind of work
- New build construction, Architecture and design
Who the buyer named
David Bell was the named contact on this notice.
