Servicing, Repair & Maintenance of Drainage and Foul Water Systems
What the buyer wrote
Annual servicing and 24 hour response time to blocked drains within the Civic Centre and other sites within the borough. The maximum response time required for emergency works under this contract is 2 hours and contractors applying must have the capacity to attend to several emergency calls at the same time. The maximum response time required for emergency works under this contract is 2 hours and contractors applying must have the capacity to attend to several emergency calls at the same time. The duration of the contract will be three years with an option of a two year extension. To access and register your company on Due North, click on the following link: https://procurement.southend.…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Servicing, Repair & Maintenance of Drainage and Foul Water Systems
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Mar 2018
- Work ends
- 31 Mar 2023
- Kind of work
- Water, drainage and flood management
Who the buyer named
The buyer published a contact address on this notice.
