Settle Bridge (Bridge no. 1435) Masonry Repairs, Resurfacing and Vegetation Removal

Your saved contracts

What the buyer wrote

Vegetation Removal and Parapet Repairs Works will be carried out under a full road closure. The contractor will be required to work 7 days per week to enable the works to be completed in as little time as possible. Vegetation removal will include: • Clear vegetation as shown on the contract drawing. • Eight trees to be removed as shown on the contract drawing Masonry Repairs will include: • Carefully dismantle dislodged areas of parapets and set aside stones that are to be reused. • Rebuild parapets according to General Arrangement drawings and reset as straight as practicable using a 1:1:6 mortar. • Rake out and repoint all mortar on parapets in the areas shown on the contrac…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Hinko Construction Ltd£68.8kends (23 Mar 2018)

Details

What the buyer calls it
Settle Bridge (Bridge no. 1435) Masonry Repairs, Resurfacing and Vegetation Removal
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
12 Feb 2018
Work ends
23 Mar 2018