Skip to the main content
The Crier

AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027

Aster Group LimitedSouth Eastservices
Your saved contracts

What the buyer wrote

Aster Group has approximately 76 foul water infrastructure assets (Sewage Treatment Plants, septic tanks and pumping stations) serving homes not connected to mains drainage. There is an ongoing requirement to undertake routine maintenance of the foul water assets to ensure correct operation and compliance with Environment Agency discharge consents along with the emptying of septic tanks to provide effluent disposal arrangements for properties served by the installations. This procurement is for the successor arrangement to the current contract which comes to an end in early 2025. The requirement is for the provision of scheduled maintenance, non-scheduled maintenance works (where instruc…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Lots
7
Where
in the South East, in the South West

Who the buyer named

Jack Edwards was the named contact on this notice.

aster.procurement@aster.co.uk