SHF Wave 3 Design and Build (Heat Pumps 2025)
What the buyer wrote
The Council has awarded a contract for the design, supply, installation and commissioning of ground source heat pump systems to up to 231 dwellings within the Balmoral tower blocks comprising Brecon, Blackdown and Grampian House. The project is funded through the Warm Homes: Social Housing Fund Wave 3 programme, supported by Council match funding, and forms part of the Council's wider housing decarbonisation and fuel poverty reduction objectives. The contract has been procured via FrameworkX and is subject to the Public Contracts Regulations 2015.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- SHF Wave 3 Design and Build (Heat Pumps 2025)
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- works
- Where
- in the East of England
Who the buyer named
The buyer published a contact address on this notice.
