Site Clearance at Morston Drift, King's Lynn

Your saved contracts

What the buyer wrote

The 2.5 Ha site is former industrial land scheduled for housing development. The contract involves the clearance of surface stockpiles of construction debris from nearby developments and the excavation of concrete slabs and foundations up to 300mm thick with localised areas over 1m thick. Apart from any wood, plastic, steel or other unsuitable material all arisings are to be retained on site. An adjacent site is available for stockpiling and crushing of material for re-use. After the excavation of all obstacles the site is to be backfilled with screened spoil from within the site and compacted to the intended development level. The site is divided into 12 zones and works are to be unde…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

P.J. Thory Ltd£138kends (31 Aug 2018)

Details

What the buyer calls it
Site Clearance at Morston Drift, King's Lynn
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
13 May 2018
Work ends
31 Aug 2018

Who the buyer named

Martin Gibbs was the named contact on this notice.