Site Descriptive Model Development: Supply Chain Support for Capability Building Early Site Characterisation
What the buyer wrote
This scope of work covers the site characterisation activities that would need to be undertaken by RWM from initial understanding based upon desk-based studies through initial seismic reflection surveys to the design, specification, permitting and planning for the initial boreholes for characterising an LSSR host rock in a sedimentary sequence. To achieve the desired outcomes set out in the introduction, we have identified the following areas of scope for this work: 1. Design a series of workshops and supporting work between workshops that will deliver the necessary understanding across the relevant teams in RWM. (Approx Dec/Jan 2019/2020) 2. Deliver the workshops and supporting work in an…
Details
- What the buyer calls it
- Site Descriptive Model Development: Supply Chain Support for Capability Building Early Site Characterisation
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 13 Jan 2020
- Work ends
- 31 Mar 2021
Who the buyer named
David Kirkbride was the named contact on this notice.
