Sixth Form College Farnborough Network Infrastructure Project Edge Switches
What the buyer wrote
Edge switch(es) design, configuration, and testing with partial installation. Over 6-8 months (during college holiday periods)
Details
- What the buyer calls it
- Sixth Form College Farnborough Network Infrastructure Project Edge Switches
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Where
- in the South East
- Kind of work
- Cloud, hosting and infrastructure
Who the buyer named
The buyer published a contact address on this notice.
