Smart Meter Load Control Device Trial
What the buyer wrote
This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above. HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing functionality built into Data Communications Company (DCC) systems to support these devices, but to date …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Smart Meter Load Control Device Trial
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 11 Jan 2019
- Work ends
- 15 Mar 2019
Who the buyer named
Victoria Hill was the named contact on this notice.
