Skip to the main content
The Crier

Smart Meter Load Control Device Trial

Your saved contracts

What the buyer wrote

This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above. HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing functionality built into Data Communications Company (DCC) systems to support these devices, but to date …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

EDMI Europe Limited£1.2mends (31 Mar 2021)

Details

What the buyer calls it
Smart Meter Load Control Device Trial
How they are buying
The buyer did not say
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
11 Jan 2019
Work ends
31 Mar 2021

Who the buyer named

Alexander Jones was the named contact on this notice.

alexander.jones@beis.gov.uk