What the buyer wrote
The supply and installation of 7no. double ablution blocks and 1no. single block, see attached drawings. The focus of these buildings is robustness and resistance to vandalism. The client has specified that the buildings must be capable of being hosed out by way of a floor laid to fall so that water can drain out through a gap below the door. There must be no visible electrical fittings / switching i.e. PIR activated lights etc. The client's preference is for durable but easily replaceable sanitary ware rather than more expensive specialist products. Although the aesthetic of a slate roof is required by planning we envisage a moulded GRP or similar solution to reduce the risk of theft/vandal…
Details
- What the buyer calls it
- South Treviddo Ablution Blocks
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Apr 2019
- Work ends
- 28 Jun 2019
Who the buyer named
Ms Jill Callicot was the named contact on this notice.
